Grana

How we turned hundreds of loose spreadsheets into a single construction control dashboard

A financial management platform that centralizes budget, materials and suppliers for construction projects in one place.

Brazil

Location

Product Designer

Role

2024 - 2025

Date

Grana
Brasil

Grana is a financial management SaaS for construction sites, built for Brazilian builders that still rely on spreadsheets to control budget. The platform centralizes materials, equipment, services and suppliers in a single dashboard, giving full visibility over the cost of every stage of a project before it even starts, and eliminating the rework of keeping everything scattered across loose spreadsheets.

WHAT IT IS

Grana is a financial management platform for construction companies, centralizing the whole cost operation in one place.

Large construction projects have a financial complexity that spreadsheets could never handle.

Grana fills that gap, centralizing in a single platform everything that used to be scattered, outdated or simply didn't exist.

Creates a project

Builds the budget

Buys materials

Logs arrivals

Financial control

BEFORE

Engineers managed everything in Excel spreadsheets.

The whole project was held hostage by loose documents. We needed to centralize everything in a single management platform.

Screenshot of the old system.
Screenshot of the old system.
Screenshot of the old system.

CHALLENGES

Centralize, control and anticipate. That's what was missing.

Large construction projects have a financial complexity that spreadsheets could never handle. Grana fills that gap, centralizing everything in one platform.

Budget control

The team structures the project financially. It defines charts of accounts, quotes materials with suppliers and gets everything ready before execution starts.

Financial progress

The office analyzes requisitions from the field, compares quotes and approves purchases — with automatic best-price indication.

Data entry

The operator logs requisitions for what's needed on site — materials, equipment and services — straight from the field, in real time.

PROCESS

So I dove deep into the project to understand what to keep, what to improve and what to invent from absolute scratch.

  1. 01

    Product discovery

    Sessions with the client and engineers to understand the business rules and the domain before any design decision.

    • Domain
    • Business rules
    • Stakeholders
    • Kickoff
  2. 02

    Persona definition

    Mapping the user profiles. Their contexts, needs and access levels inside the platform.

    • User profiles
    • Context of use
    • Permissions
    • Behaviors
  3. 03

    Initial ideation

    Exploring solutions for the challenges, focused on simplifying complex flows without losing functionality.

    • Brainstorming
    • Exploration
    • Design decisions
    • Creativity
  4. 04

    Architecture and scope

    Defining the system modules and how they connect, making sure the structure could hold the complexity.

    • Structure
    • Navigation
    • System modules
    • Flows
  5. 05

    Wireframes

    Validating the interface reasoning with the client before any investment in the visuals.

    • Mid fidelity
    • Validation
    • Basic concepts
    • Testing
  6. 06

    Visual Design

    Building the final screens with a component system that's consistent across every module and platform.

    • Concept design
    • Design system
    • Interface
    • Visual structure
  7. 07

    Documentation and handoff

    Specifications, flows and components documented to keep fidelity during the development handoff.

    • Specifications
    • Dev handoff
    • Delivery
    • Annotations

CONCLUSION

After understanding how each flow worked, a few things became clear.

Rafaela Torres

Rafaela Torres

Engineer

She follows the project closely, approves field records and makes sure everything is executed as planned.

Spot budget overruns before they happen

Access critical information quickly and precisely

Jorge Almeida

Jorge Almeida

Field operator

He's on site, logging in real time everything that's needed and everything that arrives: materials, equipment, services and invoices.

Log field information quickly and simply

Do it without needing long training

Patrícia Nunes

Patrícia Nunes

Manager

She tracks financial progress, compares budgeted vs. actual and anticipates cost overruns before they become a problem.

Compare budgeted vs. actual without cross-checking spreadsheets

Anticipate financial risks before they impact the project

Eduardo Costa

Eduardo Costa

Investor

He follows overall progress with an executive view, without needing to dive into details to understand what's happening.

Have a clear executive view of the project's progress

Understand the financial status without digging into operations

The main pains were always:

Slow to start new projects

Every project started from scratch, without reusing anything already set up in previous projects.

Costs scattered across spreadsheets

Every stage, every supplier, every material lived in a different spreadsheet, with no connection between them.

Manual quoting

Comparing supplier prices meant opening one quote at a time, all by hand.

Slow record approval

Validating what arrived on site depended on paper and manual follow-up, stalling the flow and delaying processes.

Fragmented purchase flow

Requesting, quoting, buying and receiving were disconnected steps, with no tracking between them.

Slow, manual reporting

Putting together a status report meant manually gathering data from different sources, every time.

We sketched, tested and arrived at a few ideas.

Reusable global registrations

One of the central decisions was creating the concept of CPUs and WBS. Everything is registered once and stays available for future projects.

A new project that used to require days of setup and review is now ready in minutes. Ready to start.

For 1 meter of wall, you need this much brick, cement and labor. The CPU is the ready-made recipe. For 50 meters, you just multiply.

Linear purchase flow

Before, each step of the purchase lived in isolation: requesting, quoting, buying and receiving were disconnected steps with no tracking between them.

Now, a request generates the quote, the quote becomes a purchase, and the purchase is checked at receiving. All in the same record.

Nothing gets lost between requesting and receiving. What was ordered is what arrives, and the system knows it the whole time.

Budgeted vs. actual

For every expense logged, Grana automatically compares it against what was budgeted for that stage, per stage or for the whole project.

The deviation shows up as soon as it starts, not at month-end close, when it has already become a loss.

Budgeted and actual side by side, all the time. No waiting for the month-end report to find the hole.

Field app to log arrivals

The field operator logs the arrival of materials, equipment and services straight from the phone, the moment they arrive on site.

No paper, no spreadsheet afterward. What arrived is checked against what was ordered, on the spot.

What happens on site becomes data in the system in seconds. Not days.

Best-price indication

At purchase time, the system analyzes all the quotes made with suppliers and automatically indicates the most advantageous option.

Even combining different suppliers and freight for the same purchase order.

The buyer makes the best purchase decision in seconds. Without having to do that math anywhere.

ARCHITECTURE AND SCOPE

So we defined the modules the system needed:

Home

Module

Indicators

Sub-module

Budgets

Sub-module

Projects

Sub-module

Pending items

Sub-module

Budgets

Module

Materials

Sub-module

WBS

Sub-module

Materials

Sub-module

Quotes

Sub-module

Projects

Module

Information

Sub-module

ABC curve

Sub-module

Acquisitions

Sub-module

Rentals

Sub-module

Services

Sub-module

Invoices

Sub-module

Management

Sub-module

Indicators

Sub-module

Registrations

Module

CPUs

Sub-module

WBS

Sub-module

Suppliers

Sub-module

Clients

Sub-module

Acquisitions

Module

Requests

Sub-module

Purchase orders

Sub-module

Receipts

Sub-module

Rentals

Module

Requests

Sub-module

Rental orders

Sub-module

Measurements

Sub-module

Services

Module

Requests

Sub-module

Service orders

Sub-module

Measurements

Sub-module

RESULT

And two years later, a product in production.

In the end, which problems did the redesign solve?

-70%
Reduction in the time it takes to put together a project's budget, with reusable CPUs and EAPs.
-50%
Less rework quoting suppliers, with automatic best-price indication.
100%
Centralized financial visibility, replacing control via loose spreadsheets.
40%
Reduction in the time it takes to register materials and services, reusing CPUs across projects.

WHAT I LEARNED

This was the project that taught me the most about architecture and scope.

A single piece of data changed on one screen would ripple through 300 different flows, so everything had to be tied together from the start, not adjusted after the problem showed up.

That taught me to reuse information for real.

Every piece of data that enters the system needs to make sense, because it can become valuable somewhere you never imagined when you designed the screen where it was captured. That logic is what guided treating CPU and EAP as permanent assets of the builder, not as configuration isolated to each project.

Let's build your next product?

I design and build digital products end to end, from discovery to production code, with AI built into the workflow.

Let's talk

© 2026 Gustavo Montes